Please fill out a proposal request form below and we will provide you with a proposal within approximately 3 business days. 

 
  • Weather alerts emailed prior to each storm

  • Access to live information via client portal

  • Access to start and stop times via client portal

  • Access to live GPS tracking via client portal

  • Access to service schedule and invoices via client portal

  • Clearing of all parking areas one time within 24 hours

  • Liquid pre-treat of sidewalks and paved surfaces

  • Ice melt application at onset of precipitation

  • Ice melt applications throughout storm

  • Sidewalks cleared throughout storm with onsite crew if job-site dictates or every 2 inches with application of ice melt after each clearing

  • Constant service as needed throughout storm, or plowing every 1 inch if job-site doesn’t need onsite equipment and crew

  • Refreeze ice melt application applied as needed after storm wherever refreeze warning is in effect

 
  • Weather alerts emailed prior to each storm

  • Access to live information via client portal

  • Access to start and stop times via client portal

  • Access to live GPS tracking via client portal

  • Access to service schedule and invoices via client portal

  • Clearing of all parking areas one time within 24 hours

  • Liquid pre-treat of sidewalks and paved surfaces

  • Ice melt applications every 3 to 4 inches or if icy conditions exist

  • Sidewalks cleared every 4 inches of snow

  • Plowing to start at 1 inch and every 2 inches thereafter

  • Refreeze ice melt application applied as needed after storm wherever refreeze warning is in effect

 
  • Weather alerts emailed prior to each storm

  • Access to live information via client portal

  • Access to start and stop times via client portal

  • Access to live GPS tracking via client portal

  • Access to service schedule and invoices via client portal

  • Clearing of all parking areas one time within 24 hours

  • Liquid pre-treat of sidewalks and paved surfaces

  • Ice melt application after all areas of site have been plowed

  • Sidewalks cleared once at end of snowstorm

  • Plowing to start at 1 inch and every 4 inches thereafter

  • Refreeze ice melt application applied as needed after storm wherever refreeze warning is in effect